An office move is measured in downtime, not in hours of labour. Staff who cannot sit down and work on Monday morning cost more than the entire moving quote, which is why almost every office relocation in Singapore happens after hours or over a weekend, and why sequencing matters more than speed. The work splits into three streams that have to be planned together: the furniture, which means workstations dismantled, transported and reassembled to a floor plan; the IT, which means servers, network equipment and workstations powered down, labelled, moved and brought back up in a known order; and the building, which means loading dock and goods lift bookings at both ends, security clearance for after-hours access, and insurance certificates lodged with two sets of building management. HomeToMoved matches you with vendors who work commercially and can hold all three streams at once.
Included
What a quote covers
- Pre-move site survey at both premises and a written move plan with a sequence and timings
- After-hours, overnight or weekend execution to keep business downtime to a minimum
- Workstation and partition dismantling, transport and reassembly to your new floor plan
- Labelling system tying every crate, workstation and monitor to a destination desk or room
- Handling of IT equipment: desktops, monitors, printers, network cabinets and server racks
- Supply of reusable crates for desk contents and files
- Coordination of loading dock, goods lift and after-hours access with building management at both addresses
- Insurance certificates and workers' details submitted to both buildings ahead of the move
Not included
What it does not
- IT decommissioning and recommissioning: unplugging is included, but configuring servers, networks and telephony is your IT provider's work
- Data backup before the move, which should be done and verified by you regardless of who moves the hardware
- Structured cabling, electrical and network points at the new premises
- Fit-out, carpentry, partition construction and reinstatement works at the outgoing premises
- Making good and dilapidation works required by your outgoing lease
- Disposal of redundant furniture and equipment, unless booked as disposal alongside the move
- Confidential document shredding and certified data destruction, which need a specialist provider
What it costs
How office relocation is priced
These are market rates that movers in Singapore charge, not our prices. You pay the vendor you choose. Knowing the range is how you tell a fair quote from a bad one.
S$800 โ S$3500
per relocation, small offices of roughly 5 to 30 staff
| Job | Typical range | Basis and notes |
|---|---|---|
| 5 to 10 staff | S$800 โ S$1500 | per relocation. Covers furniture handling, transport and basic IT or equipment packing. |
| 10 to 30 staff | S$1500 โ S$3500 | per relocation. Upper end reflects after-hours working, workstation dismantling and reassembly, and IT coordination. |
Priced per project after a site survey. The drivers are headcount, workstation count, IT volume, after-hours working and building access at both ends. Excludes GST. Offices above roughly 30 staff are quoted individually and we have no defensible published range for them.
Quoted individually after a survey, because we have no reliable published market rate for them: above 30 staff, server rack relocation. We would rather say so than print a number we cannot stand behind.
All prices shown are in Singapore dollars and exclude GST. Whether GST is charged on your move depends on whether the matched vendor is GST-registered; this is stated on the quote you receive.
How long it takes
A single overnight or one weekend day for an office of up to about 15 staff. Two to three nights, or a full weekend, for 15 to 30 staff where workstations are dismantled and reassembled.
How it runs
Start to finish
-
01
Survey both premises, six to eight weeks out
Headcount, workstation count, IT volume and the loading arrangements at both buildings. The moving itself needs two to four weeks of notice; the building approvals, the IT scheduling and the decision about which furniture is actually coming take considerably longer.
-
02
Written move plan with a sequence
Not a price and a date, but an order of operations: what powers down when, which floor loads first, when IT arrives at the new premises to bring systems back up. Downtime is the real cost of an office move and sequencing is what controls it.
-
03
Two sets of building paperwork
Loading dock and goods lift windows, after-hours access clearance, security passes for the crew and insurance certificates, lodged with both the outgoing and incoming building. The outgoing building usually has the tighter rules and the shorter patience.
-
04
Label everything to a destination desk
Every crate, monitor and workstation is tagged to a specific desk or room on the new floor plan. This is the difference between staff sitting down and working on Monday and staff spending Monday looking for their own monitor.
-
05
Move after hours, verify before staff return
Overnight or across a weekend. Your IT provider brings servers, network and telephony back up in the planned order, and someone walks the floor before Monday rather than discovering a dead network point at 9am.
Questions
Office Relocation FAQs
Why do office moves happen after hours?
Because downtime is the real cost. Moving on a Friday night or across a weekend means staff walk into a working office on Monday instead of losing a day or two of productivity. It also fits building rules: many commercial buildings restrict goods lift and loading dock use during office hours precisely so tenant moves do not block them.
Will the movers handle our IT equipment?
They will physically handle it: powering down, unplugging, labelling, crating, transporting and setting it back on the correct desk. What they will not do is configure it. Servers, network equipment and telephony need your IT provider on site at the new premises to bring everything back up in the right order. Schedule that for the same window as the move, not for the following morning.
Should we back up before the move?
Yes, and verify the backup restores. Movers carry insurance on hardware, but no insurance replaces data. This is standard practice for any hardware relocation and it is not a reflection on the vendor.
What does building management need from us?
Usually a booked loading dock slot and goods lift window at both addresses, after-hours access clearance and security passes for the crew, the moving company's insurance certificate, and sometimes a refundable deposit against damage to common areas. Two buildings means two sets of paperwork on two different forms, and the outgoing building often has the tighter rules.
Can we dispose of old workstations at the same time?
Yes, and it is worth doing together. Offices almost always shed furniture in a move, since the new floor plan rarely matches the old one. Booking the disposal into the same window means one crew, one set of building bookings and no second after-hours access request. Confidential documents and data-bearing drives are the exception and need a certified destruction provider.
How far ahead should we plan an office move?
Start six to eight weeks out. The moving itself needs two to four weeks of notice, but the building approvals, the IT scheduling, the floor plan and the decision about what furniture is actually coming with you take longer than people expect. A site survey at both premises early in that window is what stops the plan from unravelling in the final week.
Also worth booking together
Related services
-
Disposal and Moving
Move and declutter in one booking. Get matched with vendors who take the old sofa, mattress and wardrobe away on the same trip as the move.
-
Packing Services
Get matched with vendors for full or partial packing, with cartons, bubble wrap, fragile boxes and wardrobe boxes supplied.
-
Single Item Moving
One sofa, fridge, piano, safe or treadmill. Get matched with vendors who price per item rather than charging you for a whole lorry.